Numéro : 1948 - Year : 1984
The future large hydrodynamic tunnel of the Bassin d'Essais des carènes
A. BOVIS, Ingénieur de l'Armement, Chef de la Division « Bruit -Propulsion », Bassin d'Essais des Carènes
M. VISCONTI, Chef du Département « Essais-Recherche », Alsthom -Atlantique Neyrtec .Grenoble
In order to meet the present and future requirements of naval hydrodynamics, the French Délégation Générale pour l'Armement has approved the construction of a new large Hydrodynamic Tunnel on behalf of the Bassin d'Essais des Carènes. After completion of the design studies, the present paper constitues a rough analysis of the scientific and technical requirements for this new test facility and an overview of the main characteristics of the project. Started in 1983, the realization of the tunnel should be completed at the end of 1986.